Del Norte County Code
Home
About
Home
>
15
>
36
15.36.10 PermitRequired
15.36.20 PermitApplicationInformation required
15.36.30 PermitApplicationPlans profiles and specifications to accompany
15.36.40 Compliance with permit conditions
15.36.50 PermitApplicants signature constitutes agreement
15.36.60 Connection chargesPurpose
15.36.70 Connection chargesEstablishedTime for payment
15.36.80 Extension charges
15.36.90 Development credit
15.36.100 Connection chargesAdvance cost and refunds
15.36.110 Free services prohibited
15.36.115 Development fee
15.36.120 Service chargesMinimum monthl
15.36.130 Service chargesEffective date
15.36.131 Procedure for collection of sewer user fees on tax roll
15.36.150 Industrial wastewater treatment surchargeDetermination
15.36.160 Discrepancies between actual and reported industrial wastewater discharge quantities
15.36.170 Termination of service
15.36.180 Service chargesFailure to pay
15.36.190 Special connection charges
15.36.200 Sewer constructionBond required
15.36.210 Sewer constructionDesign and construction standards
15.36.220 Sewer constructionCompliance with local regulations
15.36.230 Sewer constructionInspectionCertification of completion
15.36.240 Sewer construction InspectionNotification of readiness
15.36.250 Condemned work
15.36.260 All costs paid by owner
15.36.270 Easements or rightsofway
15.36.280 Persons authorized to perform work
15.36.290 Excavations Warning devices required
15.36.300 Asbuilt drawingsFiling required
15.36.310 Completion of sewer prerequisite to city acceptance
15.36.320 Liability
15.36.330 Time limit on permits