In the event an easement is required for the extension of the public sewer, the applicant shall procure and have accepted by the district a proper easement or grant of right-of-way sufficient to allow the laying and maintenance of such extension or connection. Said width shall be determined by the district engineer.
(Ord. 77-42 § 827, 1977.)