Home > 15 > 36

Title: 15 - Utilities

Chapter: 36 - Sewer System-Permits and Charges

Section: 300 - Asbuilt drawingsFiling required

"As-built" drawings showing the actual location of all mains, structures, "tees" and laterals shall be filed with the district before final acceptance of the work.

 

(Ord. 77-42 § 830, 1977.)